Søborg, Denmark – from raw basement to a new tiled floor
A documented floor sequence from excavation and capillary-breaking stone layer to reinforcement, tile laying and the finished basement room.

Short answer
The existing floor was removed, excavation was carried out, a new capillary break layer was installed, and the remaining floor build-up was completed with new tiles.
BASEMENT ATLAS
Sources and evidence
Source types stay separate: technical and authority-adjacent sources support rules and risk topics, while project sources document practical experience.
Work documented
The existing floor was removed, excavation was carried out, a new capillary break layer was installed, and the remaining floor build-up was completed with new tiles.
What the case shows
The photo series shows the transition from the unfinished structure to a bright, finished basement room with large-format tiles.
Problem guide
Technical terms
Evidence & moderation
Editorial policy →BASEMENT ATLAS
Continue in the same topic
Related guides, problems, checklists, cases and technical terms from the same knowledge area.